Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
user:jobs:new [02/09/2019 15:40]
tagr
user:jobs:new [06/09/2019 09:21] (current)
tagr
Line 4: Line 4:
 :!: To work with jobs, the //Create, edit, and delete jobs// [[cms/​rights/​resource|access right]] is required. :!: To work with jobs, the //Create, edit, and delete jobs// [[cms/​rights/​resource|access right]] is required.
  
-To create a new job, press the //New// button. In the dialogue ​that opens select the job type: +To create a new job, press the //New// button. In the dialog box that opens select the job type: 
  
   * [[cmd|Execute a command over unit(s)]], ​   * [[cmd|Execute a command over unit(s)]], ​
Line 34: Line 34:
 {{ :​jobs:​units.png?​nolink }} {{ :​jobs:​units.png?​nolink }}
  
-When editing a job or a notification or viewing the properties, the unit selection ​dialogue ​box contains units selected for a job or a notification and units currently displayed in the work list. If necessary, you can add or remove units. To be able to do so, make sure you have the //Use unit in jobs...// access right to these units. If a job or notification that you are editing contains units to which you do not have enough access rights, you will be warned about it. In case you save such job or notification,​ the units will be lost. +When editing a job or a notification or viewing the properties, the unit selection ​dialog ​box contains units selected for a job or a notification and units currently displayed in the work list. If necessary, you can add or remove units. To be able to do so, make sure you have the //Use unit in jobs...// access right to these units. If a job or notification that you are editing contains units to which you do not have enough access rights, you will be warned about it. In case you save such job or notification,​ the units will be lost. 
  
 ===== Parameters for Jobs ===== ===== Parameters for Jobs =====
  
-Parameters for jobs are set in the last dialogue ​box.  ​+Parameters for jobs are set in the last dialog ​box.  ​
  
 {{ :​jobs:​params.png?​nolink }} {{ :​jobs:​params.png?​nolink }}
Line 74: Line 74:
  
 :!: //Hint//.\\ :!: //Hint//.\\
-  - To get the daily report, select the //For previous 1 days// interval of the report and enter some night time, for example, 3 am, in the execution schedule. Then, when you come to work, all the necessary reports for the previous day will already be in your email box.\\ If the workday ends after midnight, as some cars may arrive late, the daily report can be configured in the following way. Select the //For previous 24 hours// interval of the report, and enter 4 a.m. as the  activation time for the job. Then the report will automatically be executed once a day, at 4 a.m., and will contain the analysis of the data for the past day. In this case, the trips that end after midnight will not be split into two parts. ​+  - To get the daily report, select the //For previous 1 days// interval of the report and enter some night time, for example, 3 am, in the execution schedule. Then, when you come to work, all the necessary reports for the previous day will already be in your email box.\\ If the workday ends after midnight, as some cars may arrive late, the daily report can be configured in the following way. Select the //For previous 24 hours// interval of the report, and enter 4 a.m. as the activation time for the job. Then the report will automatically be executed once a day, at 4 a.m., and will contain the analysis of the data for the past day. In this case, the trips that end after midnight will not be split into two parts. ​
   - To receive a weekly report, select the //For previous 1 weeks// report interval, enter some night time in the execution schedule, and in the time control limit, select Monday. Thus, by Monday you will have reports for the past week.   - To receive a weekly report, select the //For previous 1 weeks// report interval, enter some night time in the execution schedule, and in the time control limit, select Monday. Thus, by Monday you will have reports for the past week.
   - To receive a monthly report, select the //For previous 1 months// report interval, specify the time in the execution schedule, and in the time control limit, check the box of the first day of the month. Thus, the corresponding report will arrive on the first day of each month for the previous month.   - To receive a monthly report, select the //For previous 1 months// report interval, specify the time in the execution schedule, and in the time control limit, check the box of the first day of the month. Thus, the corresponding report will arrive on the first day of each month for the previous month.
Follow us on Facebook Gurtam Wialon Twitter Gurtam Wialon info@gurtam.com   |   Copyright © 2002-2019 Gurtam