Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
nimbus:user:online:online [10/07/2018 11:35]
tagr NB-127
nimbus:user:online:online [12/03/2019 14:08] (current)
tagr NB-213
Line 14: Line 14:
 If the unit moves with schedule violation, then the time of violation is shown below it. Plus means hurry, minus — the delay from the schedule. If the violation is beyond the permissible limits, the following colors are used to draw attention to it: red for delay, yellow for hurry. The degree of permissible deviation is set in [[nimbus/​user/​usersettings/​usersettings|user settings]]. If the unit moves with schedule violation, then the time of violation is shown below it. Plus means hurry, minus — the delay from the schedule. If the violation is beyond the permissible limits, the following colors are used to draw attention to it: red for delay, yellow for hurry. The degree of permissible deviation is set in [[nimbus/​user/​usersettings/​usersettings|user settings]].
  
-In the upper right corner of the block with the route you can find an icon indicating ​that there are problematic rides ({{:​nimbus:​icons:​attention.png?​nolink}}). Rides are classified as problematic in the following situations:+In the upper right corner of the block with the route, there is an icon with the data on the actual and planned number of units on the ride ({{:​nimbus:​icons:​engaged_units.png?​nolink}}). When you hover the mouse cursor over it, a tooltip with the following information pops up: 
 + 
 +  * **Units engaged** — the percentage ratio of the actual number of units to the planned one. 
 +  * **Actual number** — the current number of units on the route that have visited at least one stop (regardless of whether it is ahead or behind the schedule).  
 +  * **Planned number** — the number of units assigned to the active rides of the route. It should be noted that not all the active rides are taken into account, but only those for which the start time has come, but the end time has not. 
 + 
 +In case there are 'problematic' ​rides, the icon {{:​nimbus:​icons:​attention.png?​nolink}} ​appears in the upper right corner of the block. Rides are classified as problematic in the following situations:
  
   * it is time to start the ride, but the unit has not yet visited any stops (did not leave for the ride);   * it is time to start the ride, but the unit has not yet visited any stops (did not leave for the ride);
Line 27: Line 33:
 When you monitor on the map, it displays all the units that are on active rides of this route and have positional data, regardless of whether these units are on the route at the moment or not. On the diagram, the number of units can sometimes be less, as it displays only the units that visited the route stops. Unit tooltips contain information about their name, active ride, as well as hurry and delay time. The time of visiting ride points that go beyond 24 hours has a pale purple highlight in the background. If a critical hurry or delay is detected, the unit icon is colored yellow or red, respectively. When you monitor on the map, it displays all the units that are on active rides of this route and have positional data, regardless of whether these units are on the route at the moment or not. On the diagram, the number of units can sometimes be less, as it displays only the units that visited the route stops. Unit tooltips contain information about their name, active ride, as well as hurry and delay time. The time of visiting ride points that go beyond 24 hours has a pale purple highlight in the background. If a critical hurry or delay is detected, the unit icon is colored yellow or red, respectively.
  
 +When you click on a stop, the map zooms in and the [[nimbus/​user/​stops/​stopscreation#​creating_stops_manually|shape of the stop]] is displayed. Another click returns the original look of the stop.
 =====Some Methods of Monitoring====== =====Some Methods of Monitoring======
  
-Ride activation happens automatically 10 minutes before the time of visiting the first scheduled point of the route (can be changed in the [[nimbus/​admin/​administration#​nastrojki_depo|depot settings]]). Activation means that the system begins to monitor (receive and analyze) messages from the unit assigned to the ride. Based on the data from the messages, monitoring of the ride is conducted.+Ride activation happens automatically 10 minutes before the time of visiting the first scheduled point of the route (can be changed in the [[nimbus/​admin/​administration#​depot_settings|depot settings]]). Activation means that the system begins to monitor (receive and analyze) messages from the unit assigned to the ride. Based on the data from the messages, monitoring of the ride is conducted.
  
 The monitoring of the ride is carried out based on the following principles: The monitoring of the ride is carried out based on the following principles:
Follow us on Facebook Gurtam Wialon Twitter Gurtam Wialon info@gurtam.com   |   Copyright © 2002-2019 Gurtam